Voltage Energy

+966 59 816 7999 sales@voltage-energy.co

  • Home
  • About Us
  • Services
    • One Time Services
    • PM Maintenance Contract
    • Installation & Testing
    • Supply of Spares
    • Equipment Rental Supply
    • Repair and Retrofit
    • IEC accredited Lab tests
    • Other Services
  • Projects
  • Blog
  • Contact Us
  • More
    • Home
    • About Us
    • Services
      • One Time Services
      • PM Maintenance Contract
      • Installation & Testing
      • Supply of Spares
      • Equipment Rental Supply
      • Repair and Retrofit
      • IEC accredited Lab tests
      • Other Services
    • Projects
    • Blog
    • Contact Us

+966 59 816 7999 sales@voltage-energy.co

Voltage Energy
  • Home
  • About Us
  • Services
    • One Time Services
    • PM Maintenance Contract
    • Installation & Testing
    • Supply of Spares
    • Equipment Rental Supply
    • Repair and Retrofit
    • IEC accredited Lab tests
    • Other Services
  • Projects
  • Blog
  • Contact Us

Installation oil work and testing commissioning - A Sneak Peek

  • //img1.wsimg.com/isteam/ip/3870f3ec-4a7d-4bf2-9ef8-39de64a798af/6af31f63-5eee-4ab7-8827-8ae9254947cf.jfif/:/rs=w:1300,h:800
  • //img1.wsimg.com/isteam/ip/3870f3ec-4a7d-4bf2-9ef8-39de64a798af/5b6783cd-6f5d-4d7e-a58d-3a99e4018895.jfif/:/rs=w:1300,h:800
  • //img1.wsimg.com/isteam/ip/3870f3ec-4a7d-4bf2-9ef8-39de64a798af/e867299b-2b86-40fb-9c83-9c7f26f36685.jfif/:/rs=w:1300,h:800
  • //img1.wsimg.com/isteam/ip/3870f3ec-4a7d-4bf2-9ef8-39de64a798af/f1d99eb9-db94-4258-bfcc-972b8134a9c4.jfif/:/rs=w:1300,h:800
  • //img1.wsimg.com/isteam/ip/3870f3ec-4a7d-4bf2-9ef8-39de64a798af/b82ee96a-a272-4eff-bb56-d4d5fae83398.jfif/:/rs=w:1300,h:800
  • //img1.wsimg.com/isteam/ip/3870f3ec-4a7d-4bf2-9ef8-39de64a798af/6af31f63-5eee-4ab7-8827-8ae9254947cf.jfif/:/rs=w:1300,h:800
  • //img1.wsimg.com/isteam/ip/3870f3ec-4a7d-4bf2-9ef8-39de64a798af/5b6783cd-6f5d-4d7e-a58d-3a99e4018895.jfif/:/rs=w:1300,h:800
  • //img1.wsimg.com/isteam/ip/3870f3ec-4a7d-4bf2-9ef8-39de64a798af/e867299b-2b86-40fb-9c83-9c7f26f36685.jfif/:/rs=w:1300,h:800
  • //img1.wsimg.com/isteam/ip/3870f3ec-4a7d-4bf2-9ef8-39de64a798af/f1d99eb9-db94-4258-bfcc-972b8134a9c4.jfif/:/rs=w:1300,h:800
  • image0
  • image1
  • image2
  • image3
  • image4
  • image5
  • image6
  • image7
  • image8
  • image9
  • image10
  • image11

20 MVA installation oil work and testing commissioning-Hedith-client star Vangaurd

MVA Transformer-Oil filtration work

Voltage Energy on the Horizon: Projects Look Photo Gallery

SEPCO III- Complete oil filing for the Layla project BSP Substation.

Oil Work of MVA Transformer

Oil Filtration Of 500KVA Transformer-Global

Transformers and

switchgears FZCO

Recently completed power projects

Jamjoom Pharmaceuticals Factory Company

Jamjoom Pharmaceuticals Factory Company

Jamjoom Pharmaceuticals Factory Company

 Oil filtration and leakage
repair, Oil and electrical testing of 8 transformers.

SEPCO III

Jamjoom Pharmaceuticals Factory Company

Jamjoom Pharmaceuticals Factory Company

Complete oil filling of Layla Project BSP substation.

Nadec

Jamjoom Pharmaceuticals Factory Company

Nadec

Overhauling of 20 transformers

TSSD

Tamer steel

Nadec

Dismantling of 200 MVA Mitsubishi Japan Transformer at SEC sub–Station Khulais & Mobilization of Transformer to TSSD Yard Jeddah for Repairing

Alkawther

Tamer steel

Tamer steel

Installation of MV cables and excavation backfilling

Tamer steel

Tamer steel

Tamer steel

Overall Maintenance and testing of MVA 12 Transformers

Recently completed power projects

CWC

Alucor

Alucor

Termination and testing for MV power cables

Alucor

Alucor

Alucor

Oil filtration and circulation of oil and cables boxes; 130/65MVA Transformers

MUDAC

Alucor

Olayan

Dismantling and removal of power Transformer and shifting next to the Jeddah Airport by crane

Olayan

Saudi Diesel

Olayan

ABB RMU N-103094.001 SF6 Gas Refilling at Ummoshar Site & supply of material & Overhauling Of 38 Distribution Transformer

Saudi Diesel

Saudi Diesel

Saudi Diesel

 Installation of termination kits and supply of material 

Tronox

Saudi Diesel

Saudi Diesel

 Replacement of gasket HV & LV on site, Oil circulation of MVA transformer 

Welcome to Voltage Energy

ASC

Mohammed Abdallah Sharbatly Co. LTD - KSA

Schneider Electric Saudi Arabia Co.

  SAAD 380KV BSP required oil treatment works &  Oil testing of transformers-33 samples 

Schneider Electric Saudi Arabia Co.

Mohammed Abdallah Sharbatly Co. LTD - KSA

Schneider Electric Saudi Arabia Co.

 Oil filtration and testing of Transformer 20MVA (33KV/13.8KV). 

Mohammed Abdallah Sharbatly Co. LTD - KSA

Mohammed Abdallah Sharbatly Co. LTD - KSA

Mohammed Abdallah Sharbatly Co. LTD - KSA

The Jeddah Cold Store's four 1600 KVA transformer units were maintained and electrically tested, and boots were replaced. 

SEC and Saudi Aramco Registrations:

Saudi Aramco Vendor ID

Saudi Aramco Vendor ID

Saudi Aramco Vendor ID

Vendor Code No. 10115300

SEC Vendor ID

Saudi Aramco Vendor ID

Saudi Aramco Vendor ID

Vendor Code No. 2013528

Our Valuable Customers

Our Valuable Clients

  • Home
  • About Us
  • One Time Services
  • PM Maintenance Contract
  • Installation & Testing
  • Supply of Spares
  • Equipment Rental Supply
  • Repair and Retrofit
  • IEC accredited Lab tests
  • Other Services
  • Projects
  • Blog
  • Contact Us

Complete Voltage Energy Corporation Ltd.

MSD Yard, 23364, Ash Shorooq, Jeddah 23364, Saudi Arabia

+966 59 816 7999 sales@voltage-energy.co

Copyright © 2025 Voltage Energy - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept